Abstract
It has been 25 years since the DCNS French Group purchased Flowmaster. DCNS
Group is organized in multisite teams and collaborative projects are set up between them. In 2007, due to
some issues related to the different versions used between sites and to the difficulty to work on the same
project easily, a new need raised up.
The need is to transfer all their data on a single Oracle database and to
interface this latter with their Technical Information System. All the steps needed to migrate data to an Oracle database and to update
them from a version to another one are introduced.